• Two Solar Powered Pump Irrigation Systems were turned over to the Irrigators’ Associations on November 17, 2021. The first recipient was Gibon Irrigators’ Association at Brgy. Gibon, Nabas, Aklan and PUJAMA Irrigators’ Association, Inc. at Brgy. Mabilo, New Washington, Aklan.

  • NIA Regional Office VI conducted an Environmental Assessment (EA) and EA Tools Training on Nov. 11-12, 2021. The training introduced different EA tools that can be applied during the pre-construction, construction, and abandonment phase of project implementation.

  • In compliance with the conditions stipulated under the issued Environmental Compliance Certificate (ECC) No. ECC-R6-1612-0012-5020, the National Irrigation Administration - Aklan-Capiz Irrigation Management Office conducted Air and Noise Sampling Activity last October 26 and 27, 2021, held near the Bayuyan Elementary School located at Brgy. Bayuyan, President Roxas, Capiz, 800-meter away from the proposed Dam axis.

  • NIA Regional Office VI joined the 4th Quarter Nationwide Simultaneous Earthquake Drill (NSED) on November 11, 2021 as mandated by OCD Memorandum No. 689 s. 2021.

    The Regional Office was joined by the Iloilo-Guimaras Irrigation Management Office (IGIMO) in observance of the NSED 2021. Together, they practiced the "Duck, Cover, Hold" and organized evacuation.

  • The National Irrigation Administration Region VI conducted the 2nd batch of the 2-day Technical Writing Workshop for Regional Office Employees. The activity was again held at Zuri Hotel and Suites, Mandurriao, Iloilo City on November 9-10, 2021.

Pages